Builder Name:Randall Brooks   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:1990
Total Flight Time:
Start/Last Date:Apr 03, 2021 - No Finish Date
Engine:Titan IO-340 180HP
Propeller:Whirlwind
 
Friendly URL: https://eaabuilderslog.org?s=RANS21RB

Home or Last Project Picture

Jun 12, 2023     Exhaust and securing fuel fittings - (3 hours)       Category: Engine
Initial install of exhaust system per instructions. Used Permatex Zinc anti-seize compound on slip joints. Also, used Nordlocks on exhaust flanges instead of supplied star washer/ washer combo. EGT probes were previously installed. I did the initial fitup of the braces for the exhaust stacks. Also, I sealed and tightened the 90 deg AN fitting on the output of the Red Cube fuel flow unit. Also checked security of all AN fittings on the fuel system and sensor manifold on the firewall.


 